cage hoisting meaning in English
罐笼提升
Examples
- Safety technical requirements for shaft cage hoisting signal system
竖井罐笼提升信号系统安全技术要求 - Type : used for single or twin cage hoists , with or without counterweight
型:可供单吊笼或双吊笼有对重或无对重的升降机使用。 - Type : used only for single cage hoists , with or without counterweight , especially when erected without vertical pipe supports . it can also be used together with vertical pipes
-型:仅供单吊笼有对重或无对重的升降机使用,特别适用于无竖管支撑安装,但也可与竖管同时使用。 - The type of double cage hoist is scq150 150 , scq100 100 , and the single hoist is scq150 , scq100 . its high efficiency , high quality and advanced design has been fully used during the erection of the famous high bridges and building
双吊笼型号为scq150 150 , scq100 100 ,单笼型号为scq150 , scq100 .该系列升降机在上海浦东徐浦大桥,江阴长江大桥和广东虎门大桥等著名大桥的施工中,充分显示了高效优质的先进性。 - Secondly , this paper made some theoretic researches on its engineering classfication and applicable scope for this technology ; then combining with project example , this paper carried out scheme design for this technology , and compared some different kinds of underpinning scheme and node and structure design , and put forward the method of " reinforcce steel bar through column " to build pile cap beam , " resistant bend and shear anchored reinforce steel bar " to strengthen column consolidation effect , and the method of " steel plate hoop " to build reinforcing bar connection of the foundation beam , etc . in the process of the consturction scheme research and implement , this paper synthetically elaborated the organizaton for project construction , put forward the construction technical measure of specific aim on the artificial pile , and pile cap beam , and underground adding layer and structure stabilization , and overall structure stabilization and so on . for this project , adopt reinforcing bar concrete to brace hole wall to ensure the safety of engineering in the artificial pile construction , use flexible connection catch to make the cage hoisting easier to simplify the construction process , use the method of earthwork statified symmetrical balance in the process of underground adding layer excavation
本文首先对于基础托换与结构加固技术的目的和意义、国内外发展状况进行了综合阐述;其次对该项技术工程分类及适应范围进行了理论上的分析研究;然后结合工程实例对该项技术进行了方案设计,对比几种不同的托换方案和节点及构造设计,提出了“通筋穿柱法”做承台梁, “抗弯抗剪锚筋法”强化柱加固效果, “钢板箍法”做地基梁钢筋连接点等多项技术;在施工方案的研究和实施过程中,对于工程施工组织进行综合阐述,并就人工挖孔桩、承台梁、地下加层及结构加固、整体结构稳定等专项施工方案提出有针对性的施工技术措施,人工挖孔桩施工采用钢筋砼护壁确保挖孔桩的安全成型,使用柔性连接钩进行钢筋笼吊装简化施工工序;承台梁施工采用梁主筋横穿柱身化学胶锚固等;地下加层综合施工技术采用土方分层对称平衡开挖,分段挖土做筏基结构自稳等;最后对于该工程实施后的效果分析,说明该项综合施工技术的可行性。